good taste✦
All WorksAll Works↗
[04]
→CIVIC TECH

RashtraNirman is a centralized command-and-analytics platform engineered to monitor 47+ active national infrastructure projects across India — surfacing delay-risk percentages, ₹-crore cost overruns, vendor reliability scores, and regional weather alerts in one unified cockpit.

We chose an obsidian dark-mode interface (#0D0D10) with ultra-bold condensed display numerals ('47', '34%', '₹8.5Cr', '₹45CR') and strict semantic color coding (emerald On Track, amber Moderate Risk, crimson High Risk, electric cobalt #1D4ED8 active states). In high-stakes operations rooms, dark surfaces reduce eye fatigue while ensuring critical red/amber alerts command immediate attention.

RashtraNirman: National Infrastructure Risk & Cost Telemetry

Discipline
Analytics Dashboard & Data Viz
Location / Client
India Infrastructure Grid
Timeline
2025
RashtraNirman
01 / The Problem

Large-scale public infrastructure projects suffer from fragmented spreadsheets across contractors, masking early warning signs like monsoon weather alerts, material bottlenecks, and vendor slippage until ₹-crore overruns occur.

02 / Research & Insight

“Decision-makers need macro-to-micro drill-down: starting from a national geospatial map and KPI strip, then clicking straight into a single site ('Delhi-Substation Overview') to inspect weekly material vs. labor vs. additional cost curves.”

03 / Design Approach
01Used oversized condensed numerals for primary KPIs (Total Active Projects, Avg Delay Risk %, Avg Cost Overrun) so command-center operators read status at a glance.
02Separated live operational noise into a dedicated right-hand notification rail (Weather Alerts, Timeline Updates, Resource Allocation) with severity badges.
03Designed multi-series area charts comparing Wages to Workers, Material Cost, and Additional Cost across Week/Month/Year toggles.
04 / Outcome

Delivered a multi-view telemetry system combining a national Project Distribution Map, live right-rail Weather & Resource Allocation alerts, a contextual Indore/UTC clock widget, and granular project drill-downs breaking down 82% High Risk drivers across time horizons (Week / Month / Year).

Theme Choice
Obsidian Dark (#0D0D10) + Semantic Risk Hues
Data Scope
47 Active Projects · Cost & Delay Telemetry
Drill-Down
National Map -> Substation Cost Breakdown
Project Screens · 04
Next Case StudyUnform Studio→